A ship's main engine in the machinery space, pipework running along its length.

01 Marine engineering

Equipment installation

Equipment installation aboard ships and tugs, inside the marine services named on the ISO 9001:2015 scope.

Division
Marine engineering
Reference
equipment-installation
Certified
ISO 9001:2015
On record
Since 2015

What the work is

Equipment installation aboard ships and tugs

Installation is the work of getting a machine aboard, seated, aligned, connected and left in a state the crew can run: foundations and seatings, alignment to the driven equipment, pipework and electrical connection.

The hard part is rarely the machine. It is the route it has to travel through the vessel, the structure it lands on, and everything it has to be reconnected to.

Equipment installation sits inside the marine services named on the ISO 9001:2015 certified scope.

Before we can quote

What to send with the enquiry

A price given without these is a guess, and a guess turns into a variation later.

Send this

01
What is being installed, and its weight and dimensions
02
Where it has to sit, and what it replaces
03
Drawings of the space, if any exist
04
Whether lifting and access are yours or ours to arrange

What comes back

First reply
Questions, or a scope we agree on
Then
A price against that scope
If a survey is needed
We say so rather than quoting around it
Certification
ISO 9001:2015, copy on request

Also in this division

The rest of marine engineering

01

Hull maintenance

Hull maintenance on ships and tugs, run out of the Visakhapatnam office.

01

System overhaul

Propulsion and hydraulic overhaul, listed on the certified scope as maintenance of equipment.

01

Shafting

Complete shaft line work on ships and tugs, carried by this division since 2015.

Tell us about the equipment installation you need

The more specific the enquiry, the more specific the answer. Vague requests get honest questions back rather than a number.